No! Eastern Shore Pipeline
  • Sign Our Petition
    • Sign our petition
    • Group Endorsement
  • About
    • Pipeline FAQs and Danger
    • #NoESPL in the Press
    • Digital Tool Kit
  • Support
  • Volunteer
  • Updates

Pipelines bring heavy industry.

8/29/2018

0 Comments

 

Guest Blog:
​West Virginia is under threat of Rockwool, thanks to a pipeline.

Thank you to guest blog writer Tracy Cannon of Eastern Panhandle Protectors, who has been fighting a pipeline in West Virginia for almost two years. The pipeline paved the way for heavy industry to move into Jefferson County WV, very close to Charles Town and Historic Harpers Ferry. 
There is no reason to believe the Eastern Shore Pipeline isn't the first step in a plan to bring the same sort of heavy industry to Maryland's Eastern Shore. 
Read more from Tracy below.
Picture
To you all who are fighting against the pipeline proposed for Maryland’s Eastern Shore-

Those of us who have been fighting the pipeline here in the Eastern Panhandle of West Virginia have a message for you:  Pipelines are not the only intrusive or hazardous thing that will come your way if you accept the pipeline being built in your area.

The pipeline being built in my area is officially known as the “Eastern Panhandle Expansion Project”.  But it has been known by other names, namely “the Potomac Pipeline”, after the river it would cross, and the “Mountaineer Gas Pipeline”, after one of the companies building it. The pipeline route begins at the connection to a fracked gas pipeline in Pennsylvania, then heads south through Maryland and under the Potomac River.  The gas companies have not yet bored under the Potomac, but they plan to this fall.

Once in West Virginia it goes from Berkeley Springs, in Morgan County, to Martinsburg, in Berkeley County.  This part of the pipeline is currently under construction.   Landowners have been sued for eminent domain; others have relented under the threat.  Woodland and farmland have been stripped of vegetation. Trees have been felled and ground into sawdust.   Sixty-foot long sections of pipeline are being trucked around the area on our narrow, winding roads. Tensions exist among property owners over who got more money for signing the right-of-way agreements with the pipeline company. 

The original destination for the pipeline route had originally been Charles Town, WV, which lies in Jefferson County.  This part of the pipeline beyond Martinsburg is still in the planning stages.  It has not been permitted yet.  However, the proposed end point has changed recently.  Mountaineer Gas declared in their Public Service Commission filing last month that the pipeline would stop, for now, at a place called Ranson to the north of Charles Town.  (More later on why Ranson ….)

Our group, Eastern Panhandle Protectors, has fought against this pipeline being built since September of 2016.  We have asked local officials on many occasions what need the pipeline served.  They gave the same answer time and again: Jobs. “What jobs?”, we asked.  The officials would often reference large corporations, which they refused to name, that had decided not to locate in Jefferson County due to the lack of natural gas service.  When pressed to name these corporations, they would say there were non-disclosure agreements in effect.  When asked what sort of corporations they were, they could not even tell us that. 

But they required gas, whoever they were.

We have found out recently which corporation and which kind of industry was planned for Jefferson County: an insulation company known by the name “Roxul” or “Rockwool”.  The Danish-based company planned to build a 400,000-foot facility on an old apple orchard.

NDA’s had been signed between the company and the city of Ranson, the school board, the Jefferson County Commission, and the Assessor’s Office.  Rockwool got $15 million in tax breaks for being so kind to come here.

This company melts down basalt rock and steel slag into a liquid, then spins it like cotton candy into fluffy insulating material.  Imagine how hot the furnace must have to be to melt down rocks!  Rock don’t melt under normal circumstances.  After a forest fire, the rocks are just charred.  The process that turns rocks into a liquid must require astronomical amounts of gas.  (Editors Note: The furnace melts the materials to 1600 degrees Celsius, as hot as volcanic lava). 

The pipeline has its sole destination at the site where this insulation factory is now being built.  The pipeline would go from Pennsylvania to Ranson for the purpose of providing gas for those furnaces.  No wonder the Transcanada and Mountaineer Gas companies wanted to build it so badly.  This company would be a huge consumer of gas.  And they would consume gas to make their product year-round, 24 hours per day.  This is important for the gas business, because in the summer gas sales lag since consumers are not heating their homes.  Rockwool would mean consistent, high demand for gas- a goldmine for Mountaineer Gas. (Editors note: Similar to how the poultry industry will use ample gas in VA). 

The proposed fracked gas pipeline was a big draw for the Rockwool company.  In addition, the highway going through the area, West Virginia Route 9, has just recently been made into a 2-lane divided highway. 
On July 7, 2017, the local newspaper wrote, “Mayor Pierson of Ranson said Roxul officials were attracted to the final city site in large measure for its access to major highways, water and sewer lines, and future abundant gas and electricity resources. With more than 400 acres, the site also offers considerable room for the company to grow its operations in the future.”
Rockwool needs “abundant gas”.  Mountaineer needs a year-round, gas-thirsty customer.  One hand washes the other. 

The Rockwool facility, however, is being fought vigorously.  Area residents have found out how much pollution would come from the plant if it were built.  The plant would put out volatile organic compounds like formaldehyde, benzene, and naphthalene.  It would emit fine particulate matter, known as PM 2.5, that can cause cancer and breathing issues. It would increase the ozone in the area, which is a primary cause of asthma in children.  Heavy metals could also be released into the air. 

Light and noise pollution would also be features of the plant.  Some of the chemicals are known to have a bad odor.  A much greater amount of truck traffic would be another “blessing” of the Rockwool facility.  The raw materials like steel slag and basalt rocks would be brought in via Interstate 81 and Route 9.  Those are heavy materials that are certain to tear up the roadway. (Editors Note: Have any roadways along the Eastern Shore recently been improved or expanded? If so, please let us know by emailing info@NoEasternShorePipeline.org) 

Heavy industry is typically fossil-fuel hungry.  Other heavy industrial plants in Martinsburg, right along the pipeline route - Quad Graphics printing, the Essroc concert plant, the other insulation factory, Knauf, the new Proctor and Gamble plant- all plan to hook up to the pipeline.  It goes right through Quad’s property. 
The sole industry in Berkeley Springs is the US Silica plant, a manufacturer of sand and glass, with really hot furnaces, has the pipeline, not coincidentally, going right through its backyard as well.

Pipelines are built for heavy industry.  If you don’t want heavy industry where your farmland used to be, and near your waterways, don’t let them build the pipeline in the first place. 
0 Comments

Aug 16 2018-Action Alert

8/16/2018

 

Take action to stop the pipeline before it starts!

We've launched an email and phone campaign toward the company that wants to build this pipeline, H4 Capital Partners, asking them to NOT build this destructive pipeline for private profit.

If you'd like to help, please send an email or make a phone call:

INSTRUCTIONS FOR EMAILING:

Send to:
info@lvipower.com AND info@delpipeco.com (this email might bounce back but send anyway)
(Please send them separately, not as one email with multiple addresses)

BCC: Info@noeasternshorepipeline.org

You can ALSO send a message through their website contact forms:
http://www.lvipower.com/contact-us.html
http://delpipeco.com/

Message to send or similar. This is our FIRST attempt to reach them, so please keep it cordial. We have a plan to increase communication efforts as needed depending on whether they respond or not:

     "To whom it may concern,
               I am writing to express my concern about your plans for a 190 mile fracked gas pipeline, starting in Rising Sun, Maryland and ending in Accomack, Virginia. I care deeply about Maryland’s Eastern Shore and do not want to see it damaged by a fracked gas pipeline. The pipeline will cross rivers, marshland and farms, doing irreparable damage during construction, and will continually harm the eco-system once operational.
               The risk of explosion from gas pipelines is very high. In the past few months alone, multiple pipelines and plants have exploded in Texas, Wisconsin and West Virginia. One of the explosions was on a pipeline less than 1 year old and has been found to be at risk at at least another 5 locations along it’s path.
 
               The people of the Eastern Shore love their land and their way of life. A gas pipeline threatens both of those, for the benefit of those who will profit. But The Shore will pay the price.
               Please meet with local stakeholders-small business owners, farmers, watermen, land owners, residents, hunters, conservationists, to discuss a clean/renewable option instead. According to one of your websites – LVIPower.com – you also build solar and wind solutions. The eastern shore would benefit from solar and wind, but suffer if this pipeline is built.
               A contingent from No Eastern Shore Pipeline is waiting to hear from you to discuss options. Please reach out to them to set up a meeting (info@NoEasternShorePipeline.org).
               Sincerely,

                              {Your Name}”

If you get a reply, forward it to info@noeasternshorepipeline.org. Do not feel the need to engage with them any further.


INSTRUCTIONS FOR CALLING:
 
Call Delmarva Pipeline Company at: 667-930-3196
Call LVI Power at: 410-989-1256
 
We expect both of these to go to VM. If so, leave the following message or similar (keep it short, we want to fill up their inbox with MULTIPLE messages, not just a few really long ones)
 
Script:
              
               “Hello, my name is {YOUR FIRST NAME ONLY} and I am calling to express my concern about your plans to build a 190 mile fracked gas pipeline though Maryland’s Eastern Shore. This pipeline will cut through rivers, marshland and farms, and do permanent damage to the eco-system.
               Gas pipelines are dangerous. In the past few months several have exploded leading to numerous deaths, many serious injuries, and millions of dollars in damages.
 
               The people of Maryland’s Eastern Shore do not need or want this pipeline, however we are open to clean and renewable energy projects like solar or wind.
 
               Please meet with a contingent of Eastern Shore stakeholders from No Eastern Shore Pipeline to discuss other options that won’t destroy what makes the Eastern Shore so special. They can be reached by emailing info@NoEasternShorePipeline.org. Thank you for your time.”
 
What to do if they answer:
              
  1. Pay attention when the answer, if they state their name write it down for us.
  2. Introduce yourself
    1. “Hi, my name is {Your name}”
  3. If they did not state their name ask it
    1. “May I ask who I’m speaking to?”
    2. Write it down
  4. Tell them why you are calling
    1. “I’m calling today because I’ve heard your company wants to build a 190 mile fracked gas pipeline through Maryland’s Eastern Shore”
  5. Tell them why you are against it:
    1. “I am against you building this pipeline because it will cause irreparable damage to the Eastern Shore ecosystem, all for the benefit of private corporations.”
  6. Tell them what you’d like them to do instead:
    1. “Instead of building this pipeline, please consider a green/renewable project if more energy production is necessary on the shore.”
  7. Ask them to meet with us:
    1. “There is a group of Eastern Shore stakeholders willing to meet with you to discuss options. They can be reached by emailing info@noeasternshorepipeline.org.”
  8. If they get rude, say thank you and hang up the phone. Do NOT argue with them.
  9. If they say anything other than “thank you for your call” write down what they say and email it to us at info@noeasternshorepipeline.org

That is all for now!! Thank you to everyone who takes a few minutes to take action against this pipeline!!
And if you haven't already done so, please sign our petition here.

 




    Archives

    August 2018

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.
  • Sign Our Petition
    • Sign our petition
    • Group Endorsement
  • About
    • Pipeline FAQs and Danger
    • #NoESPL in the Press
    • Digital Tool Kit
  • Support
  • Volunteer
  • Updates